Work Acceptance
Report Application

Digitize your work acceptance reports. Reservations with photos, owner and contractor signatures, legally valid PDF generated instantly on site.

Free 7-Day Trial

Types of Acceptance

Without reservations

Unconditional Acceptance

The works comply with the contract. Acceptance triggers the warranties and the retention guarantee is released.

With reservations

Acceptance with Reservations

Minor defects are identified. The contractor has a deadline to lift the reservations.

Preliminary Inspections

Pre-acceptance visit to identify issues to address before the final acceptance.

Acceptance Report Features

Legal Template

Structured template following best practices. Party identification, work description, effective date.

Reservation Management

List each reservation with location, description and photo. Automatic numbering.

Geolocated Photos

Each reservation is illustrated with a timestamped and geolocated photo. Irrefutable evidence.

Dual Signature

Owner and contractor representative sign on the tablet screen.

Reservation Tracking

Track the progress of reservation resolution. Automatic notifications.

Legally Valid PDF

Complete PDF document serving as proof for warranty activation.

Warranties Triggered

1 Year - Perfect Completion

The contractor must repair all defects reported in the year following acceptance.

2 Years - Biennial Warranty

Covers equipment separable from the building (shutters, doors, heating, etc.).

10 Years - Decennial Warranty

Covers damage compromising structural integrity or rendering the building unfit for its purpose.

Frequently Asked Questions

What mandatory information must a work acceptance report contain?+
Acceptance date, identification of the parties (owner, contractors), description of works, list of reservations with precise location, deadline for lifting reservations (party agreement), and acceptance ruling (with or without reservations, or refusal). The acceptance must be adversarial (article 1792-6 of the French Civil Code). The report triggers the legal warranties.
What legal warranties are triggered by the acceptance?+
Perfect completion warranty (1 year): repair of all defects reported in the report or notified within the year. Biennial warranty (2 years): separable equipment elements (fittings, shutters, radiators). Decennial warranty (10 years): damage compromising the structural integrity or rendering the building unfit for its intended purpose. These warranties are mandatory by law.
Can the owner refuse the acceptance?+
Yes, if the works are not completed or have serious defects rendering the building unfit for its intended purpose. The refusal must be justified and notified in writing. The contractor must then complete or redo the works. Note: taking possession of the premises without reservation may constitute tacit acceptance (Court of Cassation case law), triggering the warranties despite the absence of a formal report.
How to formulate reservations in an acceptance report?+
Each reservation must be precise, located, and descriptive: nature of the defect, exact location (room, wall, element), apparent severity. Examples: "30 cm crack on the north wall of bedroom 2, at 1.20 m from the floor" or "Loose tiles — 3 tiles — bathroom, shower corner". Avoid vague wording. Attach numbered photos if possible.
What is the deadline for lifting reservations after acceptance?+
The Civil Code does not set a legal deadline. In practice, the parties agree on a deadline in the report (usually 30 to 90 days). If the contractor does not lift the reservations within the agreed deadline, the owner may have the work carried out by a third party at the contractor's expense (after a formal notice left unanswered). The perfect completion warranty (1 year) covers this obligation.