Electrical

Electrician Intervention
Report Application

Create your electrical intervention reports directly in the field. Repairs, wiring upgrades, measurements, before/after photos, client signature — instant professional PDF export.

Offline mode
Client signature
Before/after photos
1-click PDF export

What the intervention report covers

A complete sheet to document every electrical intervention, from initial diagnosis to final recommendations.

Client & site identification

Client details, site address, contract number, intervention reference.

Intervention type

Repair, wiring upgrade, new installation, preventive maintenance, diagnostic.

Materials used

Spare parts, wiring, circuit breakers, RCDs — complete traceability.

Electrical measurements

Voltage, insulation, earth continuity, RCD trip — documented values.

NF C 15-100 compliance

Verification of the 6 safety points, installation compliance assessment.

Recommendations

Additional work recommended, urgency level, associated quotes.

How to write an intervention report with EasyReportGen

1

Open the template

Select the pre-configured Electrician Intervention template with all sections.

2

Document on site

Fill in the diagnosis, measurements, take before and after photos.

3

Get client signature

The client signs directly on the tablet to accept the completed work.

4

Export the PDF

Generate the complete intervention sheet as PDF, ready for the client and invoicing.

The field tool for professional electricians

Designed for tradespeople and electrical companies who work on client sites daily.

Pre-configured template

Complete intervention sheet with identification, diagnosis, measurements, materials and signature.

Before/after photos

Document the initial state and final result. Automatically timestamped and geolocated photos.

Client signature

The client signs directly on the tablet. Contractual value of the document.

Integrated measurements

Dedicated fields for voltage, insulation, earth, RCD. Values directly in the report.

Offline mode

Work even without network. Automatic sync when back online.

Professional PDF report

Complete sheet with photos, measurements and signature. Ready for the client and accounting.

Frequently asked questions about electrical interventions

When is an electrical diagnostic mandatory?+
For sale: mandatory if the installation is over 15 years old. Validity: 3 years. For rental: mandatory since 1 January 2018 if the installation is over 15 years old. Validity: 6 years. The diagnostic is performed according to standard XP C 16-600 by a certified diagnostician.
What is the NF C 15-100 standard?+
The French reference standard for low-voltage electrical installations in residential buildings. It defines: minimum number of outlets per room, mandatory dedicated circuits (oven, washing machine, hob), 30 mA residual current protection on all circuits, equipotential bonding in wet rooms, accessible main disconnection.
What are the 6 safety points checked by Consuel?+
Consuel checks: presence of a main disconnection and protection device, earthing and continuity of the protective conductor, 30 mA residual current protection at the origin of all circuits, overcurrent protection, equipotential bonding in wet rooms, and circuit identification at the distribution board.
What electrical authorizations are required?+
Authorization is mandatory for any worker performing operations on or near electrical installations. Levels: B0/H0 (non-electrician, vicinity), B1/B2 (operator/works supervisor LV), BR (LV intervention manager), BC (isolation manager). Training is refreshed every 3 years. Reference: standard NF C 18-510.
What is electrical safety upgrade vs full compliance upgrade?+
Safety upgrade corrects the 6 immediate danger points (disconnection device, earthing, 30 mA differential, overcurrent protection, equipotential bonding, dangerous outdated equipment). Full compliance upgrade (NF C 15-100) is a complete restoration of the installation to current standards. Only the safety upgrade is required by the diagnostic. Full compliance is mandatory only for new installations or major renovations.

Digitize your intervention reports

Free 7-day trial. Template included. No credit card required.

Start free trial