What the weekly progress report covers

A structured report to document every site meeting, compliant with construction practices and legally usable.

Work progress

Progress by trade, completed tasks, overall completion percentage versus forecast schedule.

On-site workforce

Staff present per contractor, subcontractors, hours worked and reported absences.

Weather & conditions

Weather conditions, impact on works, weather days declared.

Safety incidents

Accidents, near-misses, dangerous situations, corrective actions implemented.

Material deliveries

Materials received, pending orders, supply issues reported.

Next week schedule

Planned works, milestones, scheduled interventions and key focus areas.

How to write a site progress report with EasyReportGen

1

Select the template

Open the pre-configured Site Progress template with all necessary sections.

2

Document on site

Record progress, workforce numbers, take photos and note incidents.

3

Get signatures

Site supervisor and project owner sign on the tablet.

4

Export the PDF report

Generate the complete progress report as PDF, ready for distribution to all stakeholders.

Everything for rigorous site monitoring

Tools designed for site supervisors and project managers who need traceability and responsiveness.

Structured template

Complete weekly report with all essential construction site monitoring sections.

Site photos

Document progress with dated and geolocated photos. Direct annotations available.

Supervisor signature

Site supervisor and project owner sign directly on the tablet.

Offline mode

Work on site without a connection. Automatic sync when back online.

Professional PDF report

Complete document with photos, ready for distribution within 48 hours to all stakeholders.

Complete history

Find all previous reports. Track progress week by week.

Frequently asked questions about site progress reports

What elements should a site progress report contain?+
Meeting date, attendees present/absent/excused, progress by trade (% completed vs forecast schedule), blocking points and decisions made, approved modifications, impactful weather conditions, on-site workforce, next meeting. The progress report is a contractual document that serves as evidence in disputes. It is distributed within 48 hours to all stakeholders.
What is the project manager's responsibility in site monitoring?+
The project manager (architect, engineering firm) ensures the direction of works contract execution (DET) and assistance with acceptance operations (AOR). They verify compliance with plans, coordinate contractors, prepare site reports, and approve progress claims. Their liability is engaged in case of supervision failure (consistent case law).
How often should site meetings be organized?+
Weekly during active construction phase (standard practice). Biweekly during preparatory or finishing phase. For large sites: specific meetings by trade or theme (structure, MEP, facades). The frequency is defined in the contract specifications. Repeated absence of a contractor may justify formal notice.
How to manage construction delays in monitoring?+
Document the delay in the progress report with identified causes (weather, supply delay, understaffing). Check if the delay qualifies for extension (force majeure, adverse weather). Issue formal notice to the contractor if the delay is attributable to them. Apply contractual delay penalties (typically 1/3000th of the trade amount per day). Propose a catch-up schedule.
What is the CSPS and when is it mandatory?+
The CSPS (Health and Safety Coordinator) is mandatory when 2 or more companies work simultaneously or successively on a site. 3 coordination levels: level 1 (large sites over 10,000 man-days), level 2 (medium), level 3 (simple operations). The CSPS prepares the General Coordination Plan and the Technical Maintenance File.