Report Application
Solar Farm Maintenance

Digitize your solar O&M interventions. Panels, inverters, structures - thermography, electrical measurements, PDF report.

Free 7-Day Trial

Types of Interventions

Panel Inspection

Visual condition, thermography, soiling, degradation.

Inverters

Operation, alarms, efficiency, replacement.

Electrical

Cables, connectors, junction boxes, switchboard.

Structure

Mounting, tracker, anchoring, corrosion.

Cleaning

Panel washing, weeding, site maintenance.

Performance

Performance ratio, production, monitoring.

Features

O&M Checklist

Preventive and corrective maintenance templates.

Thermal Images

Integration of thermal images with annotations.

Measurements

Recording voltages, currents, insulation.

Location

Panel identification by string and position.

Offline Mode

Work on remote sites without network.

PDF Report

Professional O&M report for asset managers.

Frequently Asked Questions

What is the recommended maintenance frequency for a solar farm?+
PR is the ratio between actual energy produced and theoretical expected energy (accounting for irradiation and installed peak power). PR = Energy produced / (Irradiation x Peak power). A PR of 80-85% is considered good for an installation in Europe. Losses include: cell temperature, cabling, inverter conversion, soiling, shading, degradation. Tracking PR over time helps detect abnormal degradation.
How to detect faulty solar panels?+
Infrared thermography (thermal camera or drone): detects short-circuited cells (hotspots), faulty bypass diodes, defective connections. I-V curve measurement per string: compares actual performance to theoretical performance. Electroluminescence (EL): reveals microcracks invisible to the naked eye. Real-time monitoring: alerts on production drop per string or per inverter. A production deviation greater than 5% from the expected PR (Performance Ratio) warrants investigation.
What are the regulatory obligations for a solar farm?+
By capacity: under 3 kWp (prior declaration), 3-250 kWp (building permit if ground-mounted), over 250 kWp (permit + environmental impact study). In operation: grid connection, feed-in tariff contract or remuneration supplement, Consuel compliance certificate, initial and periodic electrical verification (decree of December 26, 2011 - UTE C 15-712 guide). For installations over 100 kWp: possible ICPE classification if on an ICPE building roof.
What is the Performance Ratio (PR) of a solar farm?+
Le PR est le ratio entre l'énergie effectivement produite et l'énergie théorique attendue (compte tenu de l'irradiation et de la puissance crête installée). PR = Énergie produite / (Irradiation × Puissance crête). Un PR de 80-85% est considéré comme bon pour une installation en Europe. Les pertes incluent : température des cellules, câblage, conversion onduleur, salissure, ombrage, dégradation. Le suivi du PR dans le temps permet de détecter les dégradations anormales.
What is the lifespan of solar farm components?+
Photovoltaic panels: 25-30 years (typical manufacturer warranty: 80% power at 25 years). Linear degradation is approximately 0.3-0.5%/year. String inverters: 10-15 years (replacement planned at least once). Micro-inverters: 15-25 years. DC cabling: 25-30 years (UV protection required). Mounting structure: 25-40 years (aluminum > galvanized steel). The cost of inverter replacement must be provisioned in the business plan.